POWER SYSTEM SIMULATION SOFTWARES

Due to the complexities of the power system network, manual computations and simulations are now considered to be impractical if not infeasible. In the dawn of the computer age, engineers had come up with many differents ways in reducing the burden of solving certain problems relating to the electrical power system. This has evolved into a very sophisticated tool which are use by many of the present generation. At present, many simulation softwares had been developed to help engineers in these tedious tasks.

These simulation softwares are known to be able to do many electrical computations and simulations namely; load flow analysis, fault calculations, reliability study, switching optimization, capacitor installation, etc. Not only that it can solve and suggest certain options, softwares can also be able to help in energy loss computation and segregation.

Analyzing power system's loss in an electric utility is not as easy as it may sounds. Many factors are necessary to come up with a reliable simulation of the utility's present system's loss. An accurate data is the first factor to consider in making such analysis since if you use an erroneous data, you will most likely get an erroneous result (Garbage In Garbage Out). The other factor to be considered in this analysis is the software to be used. Many types of power system softwares are available in the market today, each offering their own features that are supposed to be superior to others. Some power system simulation software that are present are the likes of Synergee, ETAP, PSS, DMS, etc. Later we will have a closer look with these softwares and what they offer to the users.

Comments

Popular posts from this blog

PARTS OF A POWER TRANSFORMER

What are the name of the basic parts of a Power Transformer? We can not deny the fact that only a handful of electrical engineering students are presently familiar with power transformers especially on what it looks like. Unlike a transformer we found in our homes, a power transformer’s appearance and construction is somewhat more complicated. It is not just a simple winding with a primary and secondary terminal although basically any transformer has one. The function that a power transformer plays in an electrical system is very important that an electric utility can not afford to loss it during its operation. Our discussion here will focus more on the basic parts and functions of a power transformer that are usually tangible whenever you go to a substation . Although not all power transformers are identical, nonetheless they all have the following listed parts in which the way of construction may differ.

ELECTRIC MOTOR NAMEPLATE SPECIFICATIONS

How do we interpret an electric motor nameplate? Motor standards are established on a country by country basis.Fortunately though, the standards can be grouped into two major categories: NEMA and IEC (and its derivatives). In North America, the National Electric Manufacturers Association (NEMA) sets motor standards, including what should go on the nameplate (NEMA Standard MG 1-10.40 "Nameplate Marking for Medium Single-Phase and Polyphase Induction Motors").

DISADVANTAGES OF Y-Y CONNECTION IN THREE PHASE SYSTEM

What are the disadvantages in using y-y connection? The Y-Y transformer connection was poorly understood in the early days of power engineering and it received a very bad reputation when it was first used; in fact, this connection was avoided for a long time until its limitations were overcome by good engineering practice. Some of the inherent disadvantages of the Y-Y connection are discussed below: