POWER TRANSFORMER LIFE-CYCLE COST REDUCTION CASE STUDY ANALYSIS PDF
Using long-term thermal loss-of-life analysis, probability of failure analysis, and economic analysis, it is shown that power transformers may be kept in service longer than is the present policy in many utilities. This analysis, coupled with the use of on-line dissolved gas analysers (DGA’s) and other improved monitoring equipment can instil confidence in a longer in-service life policy for large transformers. An actual Manitoba Hydro transformer replacement scenario is presented. The cost of the monitoring equipment is significantly less than the potential savings.
Comments
Post a Comment